THE GLOWING ORACLE | SHOW US THE BILL — REGIONAL CASE STUDY
Evidence snapshot: November 18, 2026. Facility stage: operating colocation data center.
CoreSite’s Boston facility BO1 is at 70 Inner Belt Road, Somerville. CoreSite says a cooling-system upgrade was expected to save nearly 8 million kWh each year. That is an operator estimate of avoided energy relative to an unspecified baseline—not the facility’s total electricity consumption or an independent utility-meter result.
Electricity
In 2018, Somerville’s Zoning Board of Appeals conditionally approved a site-plan revision for fuel cells and generators at BO1. The U.S. Energy Information Administration lists a 3.6 MW natural-gas plant at that address, operated by Bloom Energy (plant 66151). EPA’s eGRID database reports 29,838 MWh of net generation in 2023 for that plant. That is historical output from the on-site plant, not BO1’s total use, peak demand, or electricity drawn from or exported to the grid. CoreSite’s separate estimate of nearly 8 GWh a year is projected cooling energy savings, not measured savings or generation. The records do not show current generation or who paid for any utility upgrades.
Water, noise and emissions
CoreSite’s public facility page describes colocation and liquid-cooling capabilities, but the sources reviewed do not publish site-specific water withdrawal, consumptive use, wastewater discharge, cooling-tower makeup, or property-line noise measurements. The eGRID record leaves emissions fields blank; that is not evidence of zero emissions. Current emergency-generator inventory, test hours, and air-permit compliance remain unverified.
Show Us the Bill — evidence status
- Electricity: Partial: 29,838 MWh of on-site net generation in 2023; nearly 8 GWh per year in separately projected cooling savings. Whole-site use, peak demand, and grid imports and exports remain unverified.
- Water: Not documented in the reviewed public facility materials.
- Noise and air: Historical equipment approval is documented; current permits, emissions, test results, and measured sound remain unverified.
- Taxes, jobs and municipal services: Require Somerville’s parcel, tax, incentive and service-cost records.